Case Study

Workspace Solutions

DNV 2.7-2 Safe Area Modules

Share this article

We were asked to design and build a set of four office and workshop modules for an existing client. These modules needed to be fully fitted-out so that they could be immediately put into use. so that they could be immediately put into use.

The solution

Working exclusively at our Westhill Facility, our Workspace Solutions service needed to manage architectural, electrical and HVAC teams to design and build the modules in a COVID-safe environment. All our work was undertaken within the processes and procedures developed by our Project and HSEQ teams, allowing us to deliver a quality product within the client’s timescales.

DNV 2.7-2 Safe Area Modules

The Result

“Since the early part of the year, the team have had to react quickly to fabricate a real mix of control and power modules, drillers cabins and office/workshops containers. These projects, all with their own unique designs and requirements and all required within a very short time frame, have had direct access to fabrication and paint facilities through our TEXO Engineering & Fabrication teams and our own team of in-house services. This collaboration continues to provide a massive benefit for our clients, not only in cost but in quality deliverables under restricted working practices and timescales.”

– Richard Lamb, Managing Director, TEXO Workspace Solutions

DNV 2.7-2 Safe Area Modules