The chains could not be maintained under the Lifting Operations and Lifting Equipment Regulations 1998, so we needed to design a specific health and safety case for the work on the chains. With only a single rigging point for lifting the pump from its footing – creating an off-centre gravity point – and the site being an ATEX site with flammable conditions, this project was extremely sensitive.
We managed the project and achieved all the maintenance targets set by the client.
Using our specialist team, we completed tasks including:
This project is a great example of our approach to managing potentially dangerous and high-risk environments with a reliable team and with health and safety as the foremost consideration.