TEXO Asset Integrity was asked to carry out maintenance and repair to a water pump and chains. The project was initially just scoped for one visit.....
TEXO Asset Integrity was asked by a large utility company to complete a niche scope of work within a high-risk confined space. The aim of the work was...
The island of Sao Nicolau is a remote island off the West African coast, which predominantly provides inter-island flights with a flight capacity requ...
The challenge was to provide at very short notice, a completed Accommodation facility to house the Staff from the old RGS facility based near Terminal...
We were approached to understand whether our modular systems would be capable of operating with the sensitive security equipment that is found at any ...
Gatwick Airport were tasked with updating the Airports Air Traffic Control Systems and as such needed to keep the existing systems live, whilst instal...
As part of London City Airport’s Capital Development Plan, there was strategic requirement to remove the existing Baggage Handling Facility and replac...
We were contracted by a subsea operator to work on a deck spread design, engineering, fabrication and installation project, in support of its upcoming...