The challenge was to provide at very short notice, a completed Accommodation facility to house the Staff from the old RGS facility based near Terminal...
We were approached to understand whether our modular systems would be capable of operating with the sensitive security equipment that is found at any ...
Gatwick Airport were tasked with updating the Airports Air Traffic Control Systems and as such needed to keep the existing systems live, whilst instal...
As part of London City Airport’s Capital Development Plan, there was strategic requirement to remove the existing Baggage Handling Facility and replac...
We were contracted by a subsea operator to work on a deck spread design, engineering, fabrication and installation project, in support of its upcoming...
TEXO Engineering & Fabrication was awarded the project to deploy four Baker Hughes X-trees to a 2700m ultra-deep water drilling project off the coast...
We were awarded a contract by an oil and gas service company to manufacture a new prototype slewing wireline support frame, which needed to be install...
TEXO Engineering & Fabrication was asked to fabricate a Blending Skid Base Frame complete with internal pipework with full assembly trial fit, inspect...