TEXO Workspace Solutions was asked to replace a galley floor. The replacement needed to be carried out without disrupting the food service on the vess...
We were contracted by a subsea operator to work on a deck spread design, engineering, fabrication and installation project, in support of its upcoming...
This was a complex project that required strict adherence to welding practices and procedures, along with a focus on machine finish tolerances. We met...
The TEXO Asset Integrity operations team looked at all available personnel and equipment and mobilized a three-man rope access team along with rope ki...
Royal IHC asked us to work with them on the installation of the newly-built, 1500-ton J-Lay tower for McDermott International Ltd, onto its converted ...
This project had a large scope of work to be completed to a very tight time frame – and within the COVID-19 restrictions in place at the time. This me...
TEXO Asset Integrity mobilised the team to carry out the main crane A-frame and leg inspections, and to repair any anomalies, including weld defects o...
TEXO Asset Integrity mobilised a multi-disciplined, multi-skilled rope access tea, to not only complete the DROPS Survey, but also perform routine mai...
This extremely complex operation was successfully completed as a result of excellent detailed planning, involving the world largest Offshore crane, th...
Working in partnership with Entier Technical Services, our Workspace Solutions service was commissioned to replace the galley floor on the Deepsea Abe...
TEXO Port Services was asked to support the mobilisation of a subsea trencher, deck winch and containers aboard the REM Cetus – a large cargo ship. We...