TEXO’s Fabric Maintenance Manager reactedvery positively and swiftly to my request for a new innovative solution to the problems that we were experie...
As built 3D Reality Capture of a Jack Up Rig in the North Sea Offshore Industry utilising a combination of high accuracy dimensional control establish...
TEXO Engineering & Fabrication was awarded the project to deploy four Baker Hughes X-trees to a 2700m ultra-deep water drilling project off the coast...
We were awarded a contract by an oil and gas service company to manufacture a new prototype slewing wireline support frame, which needed to be install...
TEXO Engineering & Fabrication was asked to fabricate a Blending Skid Base Frame complete with internal pipework with full assembly trial fit, inspect...
We were asked by our client to work on an 11-week programme to design, fabricate and install new mogas and diesel additive tanks at the Purfleet Gas T...
TEXO provide the data you require to make operationally critical decisions whilst minimising disruption by creating highly accurate 3D models of offsh...
This was a last-minute requirement from the client, and we had to mobilise quickly to remove the old details and add the new ones over a seven-day per...
This was a complex project that required strict adherence to welding practices and procedures, along with a focus on machine finish tolerances. We met...
Our client’s end asset is based in New Zealand. They asked us to design a diesel bunkering line, which needed input from teams in the UK and in New Ze...
TEXO Asset Integrity was contracted on a project scope that covered flare tip and flare boom inspections. Our client extended the team’s deployment to...
TEXO Engineering & Fabrication was commissioned by our client to carry out an offshore survey of the Stbd Leg to allow for a method of supporting an 8...
TEXO Engineering & Fabrication was commissioned by our client to carry out an offshore survey of three Mud Pump Pressure Relief Valves (PRVs) and asso...
One of TEXO’s new clients in the marine sector after completion of the tendering and audit process were awarded the Aft Mast Fabrication for one of it...
The Client asked us to look at the Interface between the Jack-Up Rig and the fixed Installation by means of a bridge access platform. Our client’s req...
Valaris commissioned TEXO Asset Integrity to work on the Gorilla V, and offshore drilling jack-up rig. The fabric and maintenance project included the...