Case Studies - Energy

Unmanned survey captures essential transmission network data Unmanned survey captures essential transmission network data

Unmanned survey captures essential transmission network data

Working with one of the largest electricity network companies in the UK, TEXO Survey & Inspection is working on a long-term framework to inspect trans...
Assessing critical circuit resilience Assessing critical circuit resilience

Assessing critical circuit resilience

Working with one of the largest electricity network companies in the UK, TEXO Survey & Inspection is working on a long-term framework to inspect trans...
Inspection and reporting on 33kV pole structures Inspection and reporting on 33kV pole structures

Inspection and reporting on 33kV pole structures

Working for one of the largest electricity network companies in the UK, TEXO Survey & Inspection is working on a long-term framework to inspect transm...
Modifying Platform Interface Stair Tower Modules Modifying Platform Interface Stair Tower Modules

Modifying Platform Interface Stair Tower Modules

Our client asked us to manage modifications to two existing stair tower modules – originally designed, fabricated and installed by TEXO...
Supporting a move towards a greener future Supporting a move towards a greener future

Supporting a move towards a greener future

TEXO were approached to provide new piping as part of a petroleum system upgrade to accommodate E10 fuel. The client came to TEXO because we have work...
TEXO PIONEERS UNMANNED INSPECTION TEXO PIONEERS UNMANNED INSPECTION

TEXO PIONEERS UNMANNED INSPECTION

TEXO has successfully pioneered a new unmanned inspection method on a major UK North Sea FPSO, delivering significant safety, time, and cost-saving be...
Mud Lab upgrade for new offshore client Mud Lab upgrade for new offshore client

Mud Lab upgrade for new offshore client

Our client is an offshore decommissioning operator, looking for a complete Mud Lab upgrade. They were looking for a supplier that could manage the ent...
FAST TURNAROUND BY MODULAR BUILD TEAM ON ROV CONTROL CABIN FAST TURNAROUND BY MODULAR BUILD TEAM ON ROV CONTROL CABIN

FAST TURNAROUND BY MODULAR BUILD TEAM ON ROV CONTROL CABIN

Following an urgent request for an A60 Safe Area ROV Control Cabin just before the festive break, the modular build team at TEXO Workspace Solutions h...
VSD Container for Valaris 123 Installation VSD Container for Valaris 123 Installation

VSD Container for Valaris 123 Installation

TEXO Workspace Solutions were requested to carry out the Design, Manufacture and Testing of an insulated and lined VSD Switchgear container for the Va...
Offshore Wet-Room And Dry Store Floor Replacement Offshore Wet-Room And Dry Store Floor Replacement

Offshore Wet-Room And Dry Store Floor Replacement

We were approached by a current client and asked to survey and provide a proposal to remove the existing floor and to put down new floor finishes in 3...
Multi-discipline Approach to Pressure Piping Inspections Multi-discipline Approach to Pressure Piping Inspections

Multi-discipline Approach to Pressure Piping Inspections

TEXO Asset Integrity was commissioned to perform a visual and NDT inspections of pressure piping, onboard an operating semi-submersible drilling facil...
Modular One-Man Hotel, Caithness Modular One-Man Hotel, Caithness

Modular One-Man Hotel, Caithness

James Fisher Nuclear is currently creating a base in Bower Caithness, Scotland, for an ongoing decommissioning project...
Deepsea Aberdeen – Galley Floor Replacement Deepsea Aberdeen – Galley Floor Replacement

Deepsea Aberdeen – Galley Floor Replacement

Working in partnership with Entier Technical Services, our Workspace Solutions service was commissioned to replace the galley floor on the Deepsea Abe...