On-Site Welfare and Office Facilities For 30 Staff On-Site Welfare and Office Facilities For 30 Staff

On-Site Welfare and Office Facilities For 30 Staff

We proposed an interconnected modular building design which would create a flowing work area for both contractors and office staff. Within this modula...
Offshore Wet-Room And Dry Store Floor Replacement Offshore Wet-Room And Dry Store Floor Replacement

Offshore Wet-Room And Dry Store Floor Replacement

We were approached by a current client and asked to survey and provide a proposal to remove the existing floor and to put down new floor finishes in 3...
Expanding On-Site Facilities For A Growing Workforce Expanding On-Site Facilities For A Growing Workforce

Expanding On-Site Facilities For A Growing Workforce

The new module was constructed in our facility in Aberdeen and was outfitted with an additional office area. The module was transported to site when i...
Multi-discipline Approach to Pressure Piping Inspections Multi-discipline Approach to Pressure Piping Inspections

Multi-discipline Approach to Pressure Piping Inspections

TEXO Asset Integrity was commissioned to perform a visual and NDT inspections of pressure piping, onboard an operating semi-submersible drilling facil...
DROPS remedial survey onboard a pipe-lay vessel DROPS remedial survey onboard a pipe-lay vessel

DROPS remedial survey onboard a pipe-lay vessel

TEXO Asset Integrity mobilised a multi-disciplined, multi-skilled rope access team to conduct a DROPS survey, and then complete maintenance and undert...
Main crane A-frame and leg inspections on windfarm installation vessel Main crane A-frame and leg inspections on windfarm installation vessel

Main crane A-frame and leg inspections on windfarm installation vessel

TEXO Asset Integrity mobilised the team to carry out the main crane A-frame and leg inspections, and to repair any anomalies, including weld defects o...
DROPS survey for berthed vessel in Norway DROPS survey for berthed vessel in Norway

DROPS survey for berthed vessel in Norway

TEXO Asset Integrity mobilised a multi-disciplined, multi-skilled rope access tea, to not only complete the DROPS Survey, but also perform routine mai...
J-Lay Tower Installation J-Lay Tower Installation

J-Lay Tower Installation

This extremely complex operation was successfully completed as a result of excellent detailed planning, involving the world largest Offshore crane, th...
Reconfiguration to make a workspace Covid-safe Reconfiguration to make a workspace Covid-safe

Reconfiguration to make a workspace Covid-safe

We removed and repositioned mirrors to increase space between workstations. All walls and partitions were filled and repainted to create a clean, fres...
A collaborative approach to Tank Upgrades A collaborative approach to Tank Upgrades

A collaborative approach to Tank Upgrades

Our client asked us to look at tank repair and maintenance in order to ensure that their tanks were compliant with the Engineering Equipment and Mater...
Modular One-Man Hotel, Caithness Modular One-Man Hotel, Caithness

Modular One-Man Hotel, Caithness

James Fisher Nuclear is currently creating a base in Bower Caithness, Scotland, for an ongoing decommissioning project...
Deepsea Aberdeen – Galley Floor Replacement Deepsea Aberdeen – Galley Floor Replacement

Deepsea Aberdeen – Galley Floor Replacement

Working in partnership with Entier Technical Services, our Workspace Solutions service was commissioned to replace the galley floor on the Deepsea Abe...