Multi-disciplinary Solutions for Platform Interfacing on Client Decommissioning/Plug and Abandonment Campaign Multi-disciplinary Solutions for Platform Interfacing on Client Decommissioning/Plug and Abandonment Campaign

Multi-disciplinary Solutions for Platform Interfacing on Client Decommissioning/Plug and Abandonment Campaign

The Client asked us to look at the Interface between the Jack-Up Rig and the fixed Installation by means of a bridge access platform. Our client’s req...
11,000 Man-hour Fabric and Maintenance Programme for Valaris 11,000 Man-hour Fabric and Maintenance Programme for Valaris

11,000 Man-hour Fabric and Maintenance Programme for Valaris

Valaris commissioned TEXO Asset Integrity to work on the Gorilla V, and offshore drilling jack-up rig. The fabric and maintenance project included the...
Demob Project for Offshore Supply Vessel During COVID Restrictions Demob Project for Offshore Supply Vessel During COVID Restrictions

Demob Project for Offshore Supply Vessel During COVID Restrictions

This project had a large scope of work to be completed to a very tight time frame – and within the COVID-19 restrictions in place at the time. This me...
On-Site Welfare and Office Facilities For 30 Staff On-Site Welfare and Office Facilities For 30 Staff

On-Site Welfare and Office Facilities For 30 Staff

We proposed an interconnected modular building design which would create a flowing work area for both contractors and office staff. Within this modula...
Offshore Wet-Room And Dry Store Floor Replacement Offshore Wet-Room And Dry Store Floor Replacement

Offshore Wet-Room And Dry Store Floor Replacement

We were approached by a current client and asked to survey and provide a proposal to remove the existing floor and to put down new floor finishes in 3...
Expanding On-Site Facilities For A Growing Workforce Expanding On-Site Facilities For A Growing Workforce

Expanding On-Site Facilities For A Growing Workforce

The new module was constructed in our facility in Aberdeen and was outfitted with an additional office area. The module was transported to site when i...
Multi-discipline Approach to Pressure Piping Inspections Multi-discipline Approach to Pressure Piping Inspections

Multi-discipline Approach to Pressure Piping Inspections

TEXO Asset Integrity was commissioned to perform a visual and NDT inspections of pressure piping, onboard an operating semi-submersible drilling facil...
DROPS remedial survey onboard a pipe-lay vessel DROPS remedial survey onboard a pipe-lay vessel

DROPS remedial survey onboard a pipe-lay vessel

TEXO Asset Integrity mobilised a multi-disciplined, multi-skilled rope access team to conduct a DROPS survey, and then complete maintenance and undert...
Main crane A-frame and leg inspections on windfarm installation vessel Main crane A-frame and leg inspections on windfarm installation vessel

Main crane A-frame and leg inspections on windfarm installation vessel

TEXO Asset Integrity mobilised the team to carry out the main crane A-frame and leg inspections, and to repair any anomalies, including weld defects o...
DROPS survey for berthed vessel in Norway DROPS survey for berthed vessel in Norway

DROPS survey for berthed vessel in Norway

TEXO Asset Integrity mobilised a multi-disciplined, multi-skilled rope access tea, to not only complete the DROPS Survey, but also perform routine mai...
J-Lay Tower Installation J-Lay Tower Installation

J-Lay Tower Installation

This extremely complex operation was successfully completed as a result of excellent detailed planning, involving the world largest Offshore crane, th...
Reconfiguration to make a workspace Covid-safe Reconfiguration to make a workspace Covid-safe

Reconfiguration to make a workspace Covid-safe

We removed and repositioned mirrors to increase space between workstations. All walls and partitions were filled and repainted to create a clean, fres...