The Client asked us to look at the Interface between the Jack-Up Rig and the fixed Installation by means of a bridge access platform. Our client’s req...
Valaris commissioned TEXO Asset Integrity to work on the Gorilla V, and offshore drilling jack-up rig. The fabric and maintenance project included the...
This project had a large scope of work to be completed to a very tight time frame – and within the COVID-19 restrictions in place at the time. This me...
We proposed an interconnected modular building design which would create a flowing work area for both contractors and office staff. Within this modula...
We were approached by a current client and asked to survey and provide a proposal to remove the existing floor and to put down new floor finishes in 3...
The new module was constructed in our facility in Aberdeen and was outfitted with an additional office area. The module was transported to site when i...
TEXO Asset Integrity was commissioned to perform a visual and NDT inspections of pressure piping, onboard an operating semi-submersible drilling facil...
TEXO Asset Integrity mobilised a multi-disciplined, multi-skilled rope access team to conduct a DROPS survey, and then complete maintenance and undert...
TEXO Asset Integrity mobilised the team to carry out the main crane A-frame and leg inspections, and to repair any anomalies, including weld defects o...
TEXO Asset Integrity mobilised a multi-disciplined, multi-skilled rope access tea, to not only complete the DROPS Survey, but also perform routine mai...
This extremely complex operation was successfully completed as a result of excellent detailed planning, involving the world largest Offshore crane, th...
We removed and repositioned mirrors to increase space between workstations. All walls and partitions were filled and repainted to create a clean, fres...