Case Studies - Asset Integrity

Pump and chain repair and maintenance in high-risk environment Pump and chain repair and maintenance in high-risk environment

Pump and chain repair and maintenance in high-risk environment

TEXO Asset Integrity was asked to carry out maintenance and repair to a water pump and chains. The project was initially just scoped for one visit.....
High-risk confined space project for leading utility company High-risk confined space project for leading utility company

High-risk confined space project for leading utility company

TEXO Asset Integrity was asked by a large utility company to complete a niche scope of work within a high-risk confined space. The aim of the work was...
TEXO PIONEERS UNMANNED INSPECTION TEXO PIONEERS UNMANNED INSPECTION

TEXO PIONEERS UNMANNED INSPECTION

TEXO has successfully pioneered a new unmanned inspection method on a major UK North Sea FPSO, delivering significant safety, time, and cost-saving be...
Re-naming the Gabrus offshore drilling jack-up rig Re-naming the Gabrus offshore drilling jack-up rig

Re-naming the Gabrus offshore drilling jack-up rig

This was a last-minute requirement from the client, and we had to mobilise quickly to remove the old details and add the new ones over a seven-day per...
A rapid response to emergency call for entangled fishing nets A rapid response to emergency call for entangled fishing nets

A rapid response to emergency call for entangled fishing nets

The TEXO Asset Integrity operations team looked at all available personnel and equipment and mobilized a three-man rope access team along with rope ki...
Extending Flare Boom Project to Include Hull Inspections Extending Flare Boom Project to Include Hull Inspections

Extending Flare Boom Project to Include Hull Inspections

TEXO Asset Integrity was contracted on a project scope that covered flare tip and flare boom inspections. Our client extended the team’s deployment to...
11,000 Man-hour Fabric and Maintenance Programme for Valaris 11,000 Man-hour Fabric and Maintenance Programme for Valaris

11,000 Man-hour Fabric and Maintenance Programme for Valaris

Valaris commissioned TEXO Asset Integrity to work on the Gorilla V, and offshore drilling jack-up rig. The fabric and maintenance project included the...
Multi-discipline Approach to Pressure Piping Inspections Multi-discipline Approach to Pressure Piping Inspections

Multi-discipline Approach to Pressure Piping Inspections

TEXO Asset Integrity was commissioned to perform a visual and NDT inspections of pressure piping, onboard an operating semi-submersible drilling facil...
DROPS remedial survey onboard a pipe-lay vessel DROPS remedial survey onboard a pipe-lay vessel

DROPS remedial survey onboard a pipe-lay vessel

TEXO Asset Integrity mobilised a multi-disciplined, multi-skilled rope access team to conduct a DROPS survey, and then complete maintenance and undert...
Main crane A-frame and leg inspections on windfarm installation vessel Main crane A-frame and leg inspections on windfarm installation vessel

Main crane A-frame and leg inspections on windfarm installation vessel

TEXO Asset Integrity mobilised the team to carry out the main crane A-frame and leg inspections, and to repair any anomalies, including weld defects o...
DROPS survey for berthed vessel in Norway DROPS survey for berthed vessel in Norway

DROPS survey for berthed vessel in Norway

TEXO Asset Integrity mobilised a multi-disciplined, multi-skilled rope access tea, to not only complete the DROPS Survey, but also perform routine mai...
DNV-GL In-Service Inspection Programme Five-yearly Survey DNV-GL In-Service Inspection Programme Five-yearly Survey

DNV-GL In-Service Inspection Programme Five-yearly Survey

We were asked to carry out a five-yearly class survey on a windfarm installation jack-up vessel based in Denmark....
Pioneering Unmanned Inspection of North Sea FPSO Cargo Tank Pioneering Unmanned Inspection of North Sea FPSO Cargo Tank

Pioneering Unmanned Inspection of North Sea FPSO Cargo Tank

TEXO successfully pioneered a new unmanned inspection method on a major UK North Sea FPSO, delivering significant safety, time and cost saving benefit...