Case Studies - Recruitment

Multi-scope vessel upgrades at the port of Las Palmas Multi-scope vessel upgrades at the port of Las Palmas

Multi-scope vessel upgrades at the port of Las Palmas

Our client asked us to take on a wide scope of upgrades and refits to a vessel while it was in the port of Las Palmas....
Replacement galley floor Replacement galley floor

Replacement galley floor

TEXO Workspace Solutions was asked to replace a galley floor. The replacement needed to be carried out without disrupting the food service on the vess...
Offshore canteen upgrade Offshore canteen upgrade

Offshore canteen upgrade

We were asked by our client to refurbish their onboard canteen. They wanted a bright, colourful solution to make this a welcoming place for crew...
GATWICK AIRPORT MODULAR ATC DATA CENTRE GATWICK AIRPORT MODULAR ATC DATA CENTRE

GATWICK AIRPORT MODULAR ATC DATA CENTRE

Gatwick Airport were tasked with updating the Airports Air Traffic Control Systems and as such needed to keep the existing systems live, whilst instal...
Six modular classrooms Install for Castleview Primary School Six modular classrooms Install for Castleview Primary School

Six modular classrooms Install for Castleview Primary School

Our client, Amey, was working with Castleview Primary School is situated in Craigmillar, south east Edinburgh to expand the school’s facilities....
Modifying Platform Interface Stair Tower Modules Modifying Platform Interface Stair Tower Modules

Modifying Platform Interface Stair Tower Modules

Our client asked us to manage modifications to two existing stair tower modules – originally designed, fabricated and installed by TEXO...
Multi-disciplinary project for well test overboard vent line Multi-disciplinary project for well test overboard vent line

Multi-disciplinary project for well test overboard vent line

This project used the full breadth of our multi-disciplinary approach to client work and presented a number of challenges to the team....
FAST TURNAROUND BY MODULAR BUILD TEAM ON ROV CONTROL CABIN FAST TURNAROUND BY MODULAR BUILD TEAM ON ROV CONTROL CABIN

FAST TURNAROUND BY MODULAR BUILD TEAM ON ROV CONTROL CABIN

Following an urgent request for an A60 Safe Area ROV Control Cabin just before the festive break, the modular build team at TEXO Workspace Solutions h...
VSD Container for Valaris 123 Installation VSD Container for Valaris 123 Installation

VSD Container for Valaris 123 Installation

TEXO Workspace Solutions were requested to carry out the Design, Manufacture and Testing of an insulated and lined VSD Switchgear container for the Va...
DNV 2.7-2 Safe Area Modules DNV 2.7-2 Safe Area Modules

DNV 2.7-2 Safe Area Modules

We were asked to design and build a set of four office and workshop modules for an existing client. These modules needed to be fully fitted-out so tha...
Tolmount Platform Interface Tolmount Platform Interface

Tolmount Platform Interface

TEXO Engineering and Fabrication was contracted to carry out the design, construction and installation of this platform interface. The project also re...