TEXO Workspace Solutions was asked to replace a galley floor. The replacement needed to be carried out without disrupting the food service on the vess...
The challenge was to provide at very short notice, a completed Accommodation facility to house the Staff from the old RGS facility based near Terminal...
We were approached to understand whether our modular systems would be capable of operating with the sensitive security equipment that is found at any ...
Gatwick Airport were tasked with updating the Airports Air Traffic Control Systems and as such needed to keep the existing systems live, whilst instal...
As part of London City Airport’s Capital Development Plan, there was strategic requirement to remove the existing Baggage Handling Facility and replac...
Following an urgent request for an A60 Safe Area ROV Control Cabin just before the festive break, the modular build team at TEXO Workspace Solutions h...
TEXO Workspace Solutions were requested to carry out the Design, Manufacture and Testing of an insulated and lined VSD Switchgear container for the Va...
We were asked to design and build a set of four office and workshop modules for an existing client. These modules needed to be fully fitted-out so tha...
TEXO Engineering and Fabrication was contracted to carry out the design, construction and installation of this platform interface. The project also re...