TEXO Workspace Solutions was asked to replace a galley floor. The replacement needed to be carried out without disrupting the food service on the vess...
Our client is an offshore decommissioning operator, looking for a complete Mud Lab upgrade. They were looking for a supplier that could manage the ent...
Following an urgent request for an A60 Safe Area ROV Control Cabin just before the festive break, the modular build team at TEXO Workspace Solutions h...
TEXO Workspace Solutions were requested to carry out the Design, Manufacture and Testing of an insulated and lined VSD Switchgear container for the Va...
We proposed an interconnected modular building design which would create a flowing work area for both contractors and office staff. Within this modula...
We were approached by a current client and asked to survey and provide a proposal to remove the existing floor and to put down new floor finishes in 3...
The new module was constructed in our facility in Aberdeen and was outfitted with an additional office area. The module was transported to site when i...
We removed and repositioned mirrors to increase space between workstations. All walls and partitions were filled and repainted to create a clean, fres...
Working in partnership with Entier Technical Services, our Workspace Solutions service was commissioned to replace the galley floor on the Deepsea Abe...
We were asked to design and build a set of four office and workshop modules for an existing client. These modules needed to be fully fitted-out so tha...