Case Studies - Utilities

High-risk confined space shaft and tunnel inspection High-risk confined space shaft and tunnel inspection

High-risk confined space shaft and tunnel inspection

As part of our framework agreement with Yorkshire Water, we offer a high-risk confined space rescue team twice weekly...
Emergency hydraulic line replacement for Yorkshire Water Emergency hydraulic line replacement for Yorkshire Water

Emergency hydraulic line replacement for Yorkshire Water

Yorkshire Water asked our team to respond to an emergency scope of work to replace failed hydraulic lines at one of its reservoirs. ...
Rope access maintenance overhaul at Fryston Rope access maintenance overhaul at Fryston

Rope access maintenance overhaul at Fryston

As a primary contractor for Yorkshire water, the TEXO team was asked to investigate a screen fault. When our engineer got to the site...
High risk confined space project for Yorkshire Water High risk confined space project for Yorkshire Water

High risk confined space project for Yorkshire Water

We work with Yorkshire Water on an ongoing basis, helping the company to manage its assets – particularly those where access is difficult or potential...
UAS Racking Inspection – Internal Drone Inspection Using the Elios 3 UAS Racking Inspection – Internal Drone Inspection Using the Elios 3

UAS Racking Inspection – Internal Drone Inspection Using the Elios 3

Conventional methods for racking inspection would require either rope access or working from a mobile platform...
Unmanned survey captures essential transmission network data Unmanned survey captures essential transmission network data

Unmanned survey captures essential transmission network data

Working with one of the largest electricity network companies in the UK, TEXO Survey & Inspection is working on a long-term framework to inspect trans...
Assessing critical circuit resilience Assessing critical circuit resilience

Assessing critical circuit resilience

Working with one of the largest electricity network companies in the UK, TEXO Survey & Inspection is working on a long-term framework to inspect trans...
Inspection and reporting on 33kV pole structures Inspection and reporting on 33kV pole structures

Inspection and reporting on 33kV pole structures

Working for one of the largest electricity network companies in the UK, TEXO Survey & Inspection is working on a long-term framework to inspect transm...
Pump and chain repair and maintenance in high-risk environment Pump and chain repair and maintenance in high-risk environment

Pump and chain repair and maintenance in high-risk environment

TEXO Asset Integrity was asked to carry out maintenance and repair to a water pump and chains. The project was initially just scoped for one visit.....
High-risk confined space project for leading utility company High-risk confined space project for leading utility company

High-risk confined space project for leading utility company

TEXO Asset Integrity was asked by a large utility company to complete a niche scope of work within a high-risk confined space. The aim of the work was...
UAV Storm Tank Inspection UAV Storm Tank Inspection

UAV Storm Tank Inspection

TEXO DSI was commissioned to undertake aerial scanning and inspection of stormwater tanks beneath the proposed sites for the Commonwealth Games. ...
Swinburne Reservoir Pipeline Survey – Inspection and survey of tunnel route Swinburne Reservoir Pipeline Survey – Inspection and survey of tunnel route

Swinburne Reservoir Pipeline Survey – Inspection and survey of tunnel route

TEXO DSI undertook a series of investigations of 3km of an underground Victorian brick arch tunnel network linking two reservoirs. Manned entry was no...